Back to category

Dust Cover Kit, shock absorber Protection Kit 916806 Kayaba
-
Free 30 days exchanges
-
Any part, any car
-
Fast delivery
-
Expert support
Fit guarantee, show parts suitable for your vehicle.
or .
-
Specifications
Fitting Position Rear Axle application Rubber stoppers with dust cover Number in packaging 2 (set) Pieces needed 2 Warranty 2 years -
Applicability
NISSAN PRIMERA PRIMERA (P10) | 06.1990-06.1996 1.6 - 1597ccm, 102pk, 75kw - GA16DE PRIMERA (P10) | 06.1990-06.1996 1.6 - 1597ccm, 90pk, 66kw - GA16DS PRIMERA (P10) | 06.1990-06.1996 1.6 - 1597ccm, 97pk, 71kw - GA16DS PRIMERA (P10) | 06.1990-06.1996 2.0 16V - 1998ccm, 116pk, 85kw - SR20DI PRIMERA (P10) | 06.1990-06.1996 2.0 D - 1974ccm, 75pk, 55kw - CD20 PRIMERA (P10) | 06.1990-06.1996 2.0 GT - 1998ccm, 150pk, 110kw - SR20DE PRIMERA (P10) | 06.1990-06.1996 2.0 i - 1998ccm, 125pk, 92kw - SR20DE PRIMERA Hatchback PRIMERA Hatchback (P10) | 06.1990-06.1996 1.6 - 1597ccm, 102pk, 75kw - GA16DE PRIMERA Hatchback (P10) | 06.1990-06.1996 1.6 - 1597ccm, 90pk, 66kw - GA16DS PRIMERA Hatchback (P10) | 06.1990-06.1996 1.6 - 1597ccm, 97pk, 71kw - GA16DS PRIMERA Hatchback (P10) | 06.1990-06.1996 2.0 - 1998ccm, 150pk, 110kw - SR20DE PRIMERA Hatchback (P10) | 06.1990-06.1996 2.0 - 1998ccm, 152pk, 112kw - SR20DE PRIMERA Hatchback (P10) | 06.1990-06.1996 2.0 16V - 1998ccm, 116pk, 85kw - SR20DI PRIMERA Hatchback (P10) | 06.1990-06.1996 2.0 D - 1974ccm, 75pk, 55kw - CD20 PRIMERA Hatchback (P10) | 06.1990-06.1996 2.0 i - 1998ccm, 125pk, 92kw - SR20DE -
Manufacturer
For nearly a century, KYB has specialized in hydraulics, with technology widely used in the automotive industry. KYB is the leading hydraulic company from Japan. The KYB group, which has 15,000 employees worldwide,has a turnover of more than 3.8 billion, of which 60% comes from the sale of shock absorbers for cars. From its 15 factories in Asia, Europe and the United States, KYB has an annual production capacityof more than 75 million shock absorbers. KYB also has the largest shock absorber factory in the world, with a capacity of more than 50 million units. It is highly automated and can change from one strut to another in 15 seconds from producing. -
Delivery time
Expected delivery date:
29-04-2025
