Hose, crankcase breather
- Free 30 days exchanges
- Any part, any car
- Fast delivery
- Expert span> support
Fit guarantee, show parts suitable for your vehicle.
or .
-
Specifications
Material NBR (nitrile butadiene rubber) Inner diameter 1 [mm] 21 Inner diameter 2 [mm] 17,5 Colour Black Guarantee 2 years Hose Length [mm] 415 Similar products of other manufacturers
Manufacturer Manufacturer number Price CAUTEX 757493 ESEN SKV 31SKV134 FARE SA 14792 FEBI BILSTEIN 49798 GATES EMH196 (this product) Metalcaucho 35021 -
Applicability
ALPINA ROADSTER V8 ROADSTER V8 (E52) | 06.2002-10.2003 4.8 V8 - 4837ccm, 381pk, 280kw - M62 B48 (488S2) BMW X5 X5 (E53) | 01.2000-10.2006 4.4 i - 4398ccm, 286pk, 210kw - M62 B44 (448S2) X5 (E53) | 01.2000-10.2006 4.6 is - 4619ccm, 347pk, 255kw - M62 B46 (468S1) -
Original part numbers
11151705258 BMW 11157556838 BMW -
Manufacturer
With more than 100 years of experience, Gates is one of the largest manufacturers of drive belts, distributors and relatives in passenger cars. Over 35 automotive brands make use of distributor straps, multi-straps, tensioners and tension rollers produced by Gates at the first installation. The same products are then sold under the Gates label to the private market.
In addition to loose belts, spanners and related, Gates also sells complete kits to renew the engine's drive. These kits are especially popular with garages and service points because they guarantee that all crucial parts of the engine are in top condition. An additional advantage is that a complete installation kit is often more advantageous and always contains the right products, specific to your vehicle.
Gates products distinguish themselves in the following areas:
- Top quality OE products
- OE durability
- Complete distribution and Multirim replacement kit
- Also available in full set water pumps available at reduced rate
- Substantially cheaper than an original Belt (set) from the dealerAt the moment we have the following Gates products in our range:
- Distribution & Distribution
- Multiriemen & Multiriemsets
- Teamrolls & Walkrolls
- Thermostats -
Delivery time
Expected delivery date:
21-11-2024
-
Questions?